MIL-PRF-12386F
e. Treatment, painting, or color if other than specified (see 3.10).
f. Packaging requirements (see 5.1).
6.3 First article. When a first article inspection is required, the items should be a
preproduction model. The first article should consist of one or more units. The contracting
officer should include specific instructions in acquisition documents regarding arrangements for
examinations, tests, and approval of the first article test results and disposition of the first article.
6.4 Subject term (key word) listing.
Pinhole application
Split application
6.5 Changes from previous issue. Asterisks (or vertical lines) are not used in this
revision to identify changes with respect to the previous issue due to the extensiveness of the
changes.
Custodians:
Preparing activity:
Army - AT
Army - AT
Air Force - 99
(Project 4730-2011-082)
Review activities:
Navy - MC
DLA - CC
NOTE: The activities listed above were interested in this document as of the date of this
document. Since organizations and responsibilities can change, you should verify the currency
of the information above using the ASSIST Online database at https://assist.daps.dla.mil.
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business