4.4.2 Tests.
4.4.2.1 Hydrostatic tests. Clamps shall be subjected to the following hydrostatic tests as
applicable. The test fluid shall be water.
4.4.2.1.1 Type I (split application). Test as follows: (a) In a pipe of the correct size for
the clamp, prepare a slit 2 inches long and 0.063 inch wide. (b) Apply clamp with gasket over the
slit. (c) Slowly raise the water pressure to the applicable hydrostatic test pressure in steps of
50 psi from 1000 to 1350 psig or as specified in 3.8 and hold for 5 minutes. Evidence of leakage
shall constitute failure of this test.
4.4.2.1.2 Type II (pinhole application). Test as follows: (a) In proper size pipe, prepare
an artificial leak 0.25 inch in diameter. (b) Apply clamp with gasket over the leaking area. (c)
Raise the water pressure to the applicable hydrostatic pressure as specified in 3.8 and hold for
2 minutes 30 seconds. Evidence of leakage shall constitute failure of this test.
5. PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall be as specified
in the contract or order (see 6.2). When packaging of materiel is to be performed by DoD or in-
house contractor personnel, these personnel need to contact the responsible packaging activity to
ascertain packaging requirements. Packaging requirements are maintained by the Inventory
Control Point s packaging activities within the Military Service or Defense Agency, or within the
military service s system commands. Packaging data retrieval is available from the managing
Military Department s or Defense Agency s automated packaging files, CD-ROM products, or
by contacting the responsible packaging activity.
6. NOTES
(This section contains information of a general or explanatory nature that may be helpful, but is
not mandatory.)
6.1 Intended use. Clamps are intended to be used for emergency repair of pinholes
and/or splits in pipelines.
6.2 Acquisition requirements. Acquisition documents should specify the following:
a.
Title, number, and date of this specification.
b.
Definitive part number of clamp, including type, and size required (see 1.3).
c.
If required, the specific issue of individual documents referenced (see 2.2.1 and 2.3)
d.
When first article is required, the time frame required for submission of first article
model, and number of clamps required (see 3.2).
8
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business